    How to assemble and install single girder overhead crane?

    in KOK4 Scrimmages

    Do you know how to assemble overhead crane? How to assemble and install ? It doesn’t matter if you don’t know, we will show you how to assemble 5 ton single girder overhead crane below. Let’s check these crane assembling steps.

    Single Girder Overhead Crane Specifications:

    • Lifting capacity: 5 tons

    • Lifting height: 6 meters

    • Span: 20 meters

    first process----Install and fix

    Single girder overhead crane is one kind lifting tools used in the warehouse and it contains the main girder, s, electric hoist and electrics.Firstly we shall put one side rail in the center of bearing beam, and then fix it by the welding bolts and platen. After that, we shall ruler the distance and fix the other side rail in the proper position. See the below picture:


    Crane rail fixed installation

    Overhead crane installation second process----Connect the main girder

    40GP container inside length is 11.8m,so in order to put the main girder into the 40GP container, we will produce the main girder into two pieces, one is 11 meters and one is 9 meters, see the below picture.

    Firstly, we put the 11 meters length girder and 9 meters girder into the open area, then use the forklift to ship two pieces together. During this process, we shall look at the two pieces girders bolts holes, then fix the girders by our supplied high strength bolts, see the picture:


    Two pieces main girder connection

    Overhead crane installation third process----Connect the main girder and end carriages together

    We ship the two pieces end carriages besides the main girder. With the help of forklift, we should fix one side end carriage to main girder. Meanwhile, we should fix the electrics box and connect the cables. Then we fix the motors, travel limit switch and other small parts, see the below picture:


    Crane main girder and end carriages connection</